Invitation to Tender |
|
|
TYPE of WORK |
Office Partitions |
Issue Date |
2/12/2009 |
Supply and fit approximately 80 linear metres of 2.5 metre height office partitions to form 3 meeting rooms with 2 off 6 metre by 2.5 metre sliding internal walls to convert to one large room. On the first floor create 10 office spaces alternating solid with 75mm thick walls and 27 off glazed full height panels. 13 of doors.The work must be completed before 31st March 2010. |
Indicative Value |
£40,000 |
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Underfloor Heating |
Issue Date |
2/12/2009 |
Supply and install underflow heating to be powered by air source heat pumps underfloor heating across 4 floors totalling 520 square metres. Approximately 40 zones, building will be well insulated with low heat loss factors. To include all manifolds, distribution, controls and 40 wireless zonestats and receivers |
Indicative Value |
£10,000 |
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Screeding |
Issue Date |
2/12/2009 |
To supply and lay approximately 520 metres of 75mm thick fast drying screed over four floors and over low temperature underfloor heating. |
Indicative Value |
£10,000 |
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Air source heat pumps |
Issue Date |
2/12/2009 |
To supply and install air source heat pumps delivering the equivalent of 28 Kw to include controllers and all pumps and piework |
Indicative Value |
|
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Double Glazing |
Issue Date |
2/12/2009 |
To supply and install Energy Rating B Double glazing comprising 34 windows, 4 off fire doors plus 1 double main entrance door and side panel |
Indicative Value |
£30,000 |
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Lift Refurbishment |
Issue Date |
2/12/2009 |
To recondition a six person hydraulic lift and improve its appearance and energy efficiency and improve it environmental performance |
Indicative Value |
£25,000 |
Quotes in by Date |
15/1/2010 |
TYPE of WORK |
Electrical Work |
Issue Date |
2/12/2009 |
Rewire and replacement of approximately 100 inset lighting units with low energy high frequency luminaires, approximately half of which are emergency units, to include PIR Occupancy control in approximately 40 zones |
Estimated Value |
N/A |
Quotes in by Date |
15/1/2010 |
Quotations should be emailed to info@integria.org.uk with the subject line of "GHTENDER".
|
|